Structure |
R.C.C. framed structure |
Super Structure |
Good quality table moulded bricks with cement mortar. |
Main Door |
Designed teak wood door with safety lock. |
Internal Doors |
Teak wood frames with good quality flush doors. |
Windows |
Teak wood frames with teak wood glazed shutters and .safety Iron grills. |
Finishing |
Internal walls with luppam finish external walls sponge finish |
Flooring |
Marble flooring in all the rooms toilets with ceramic flooring. |
Toilets |
Coloured glazed tiles dado for toilets upto 7’0”, one EWC, Indian WC with LL tank, wash basin and quality fittings. |
Kitchen |
Black granite cooking platform with SS sink and dado
upto 2’ height above kitchen platform. |
Painting |
Inside one coat primer with two coats OBD paint and out side one coat primer with two coats cement paint. .Enamel paint for doors and windows. Polish for main .door. |
Plumbing |
Good quality sanitary wear with C.P. Fittings provision for cold and hot water mixture in bath rooms, tap at washing area. |
Water |
Water supply from sumps and overhead tanks with separate provision for Manjeera and bore-well. |
Water Proofing |
Water proofing in toilets, terrace, over head tanks, septic tanks
and low level water sumps. |
Electrical |
Concealed copper wiring of ISI standard make switches
(Anchor or equivalent) with adequate points in all rooms. T.V. and telephone points are also provided |
Security |
.Round the clock security through CC TV and intercom. |
Generator |
Stand by generator for common areas. |
Lift |
6 Passenger branded lifts (2 No’s). |
| |
|